Skip to Content Skip to Navigation
Menu
pH
B (5.8 - 6.2)
Medium,High (150 - 300 ppm)
Moist to Wet
A (65 - 72º Fahrenheit)
A (60 - 65º Fahrenheit)
A (40 - 50º Fahrenheit)

Spring to Fall Finish, 1 ppp

Starting Materials: 
Liners
6" and Gallon Pot : 2.25": 8-10 weeks; Quick Turn: 4-6 weeks
10-12" and Two Gallon Pot : 2.25": 12-16 weeks
18" and Three Gallon Pot : 2.25": 16-20 weeks; Quick Turn: 12-16 Weeks
Over Wintering Temperature: 
polyhouse - all others

Flowers continuously from July until frost. A light pinch after flowering will result in fresh terminals 6-8 weeks later. NOTE: If you hard prune after mid summer flowers will be delayed until the end of September.

Aphids, Leaf Spot, Spider Mites

Grower Tips: 

NOTE: Even though Limelight is a REBLOOMER if you hard prune in mid summer flowers will be delayed until the end of September. Versus a light pinch which will produce flowers by early September. Try staging your crop and have 3-4 blocks pinching a block every 2 weeks.

Do not move outside
Vernalization: 
Cold Required
Award Year Award Plant Trial
2010 Plant of Merit University of Georgia
2010 Plant of Merit University of Georgia
2010 Plant of Merit University of Georgia
2009 Knock Your Socks Off University of Georgia
2009 Knock Your Socks Off University of Georgia
2009 Knock Your Socks Off University of Georgia
2007 Knock Your Socks Off University of Georgia
2007 Knock Your Socks Off University of Georgia
2007 Knock Your Socks Off University of Georgia
2007 Knock Your Socks Off University of Georgia

Plants associated with this Culture:

Back to Top

Find plants you love and create idea boards for all your projects.

To create an idea board, sign in or create an account.